Install Verification Checklist
How to complete the Install Verification Checklist for WOBM

Step 1 – Customer Details
Input Details: First Name, Last Name, Company Name and Email

Step 2 – Location
Provide photographic evidence that Right Weigh Gauges are installed as per the Right Weigh Gauge Installation Guide.
At a minimum gauges must be:
Forward & Outside: Located as far forward and to the outside as possible.
Drivers' Side: Installed on the right-hand side of the vehicle (drivers' side).
Not Covered: Must not be shrouded or obstructed by metal objects (e.g. toolboxes, air tanks, or custom metal enclosures).

Step 3 – Powering
Verify that Right Weigh Gauges have been powered correctly.

Step 4 – Set Average Steer (S-AVG)
Set Estimated Steer (S-AVG) on Right Weight Gauges.

Step 5 – Verify TAG Install & Serial
Provide photographic evidence that the V-DAQ TAG has been installed correctly.
Input the Serial Number of V-DAQ TAG

Step 6 – Compliance Records
Upload clear photos of the following information for each asset.
- VIN
- Registration
- Right Weigh Serial Number

Step 7 – Calibration
Acknowledge Calibration Requirements

Step 8 – Authorisation

What's next?
V-DAQ will review your checklist against Right Weigh installation requirements.
If it fails: You are responsible for fixing any issues before certification can continue.
If it passes: V-DAQ will verify the gauge-to-TAG connection before certification.
Need more help?
If you're still experiencing issues:
- Contact the V-DAQ Support Team: (02) 4204 8472
- Send us an email: support@v-daq.com.au
